Buderus Logano G115/3 WS Installation And Service Instructions Manual page 40

Low-temperature oil boiler
Hide thumbs Also See for Logano G115/3 WS:
Table of Contents

Advertisement

8
Heating system servicing
On-demand maintenance procedures
1.
Shutting down the heating system
2.
Removing and cleaning the heat exchanger baffles
3.
Cleaning heat exchanger heater flue (heating surfaces) and
combustion chamber and afterwards refitting heat exchanger baffles in
4.
Checking seals/cord gaskets on burner door and burner and replacing
5.
Commissioning the heating system
6.
Final check of the servicing work
7.
Checking safe and proper operation
Confirmation of properly completed servicing
Date:______
Date:______
1.
2.
3.
4.
5.
6.
7.
Company stamp/
Company stamp/
signature
signature
40
original positions
as necessary
Date:______
Company stamp/
signature
Page
Date:______
34
36
36
36
29
Company stamp/
signature
Date:______
Date:______
Company stamp/
Company stamp/
signature
signature
Logano G115 WS US/CA – 6 720 813 418 (2019/09)
Date:______
Date:______
Company stamp/
Company stamp/
signature
signature
Date:______
Date:______
Company stamp/
Company stamp/
signature
signature

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents