Task flow navigation
The following references in the task flow are listed here alphabetically:
•
"Adding a switch to an anchored NEBS 2000 frame" (page 32)
•
"Assess air filter maintenance" (page 33)
•
"Assess cable management" (page 35)
•
"Assess environmental requirements" (page 49)
•
"Assess power cable location" (page 54)
•
"Assess the location of a Passport 15000 or 20000" (page 55)
•
"Assess the location of a system of ac rectifiers" (page 74)
•
"Assess the locations of peripheral equipment" (page 76)
•
"Assess spare parts storage and selection" (page 83)
•
"Assess timing requirements" (page 85)
•
"Plan for the use of an equivalent mounting apparatus" (page 87)
Passport 15000, 20000 Site Requirements and Preparation Guide
Chapter 2 Planning considerations 31
5.2S2