Chapter 3
Site preparation
Task flow of site preparation
Figure 7
Task flow of site preparation
PP_TASK_1103
Task flow navigation
Prepare the site for the anchoring a NEBS 2000 frame that houses one or two
Passport 15000 or 20000 switches.
•
"Task flow of site preparation" (page 95)
This task flow shows you the sequence of procedures you perform to prepare
a site for anchoring a NEBS 2000 frame. To link to any procedure, go to "Task
flow navigation" (page 95).
Site
Before you begin
preparation
Using the NEBS floor template
Preparing the floor for anchor holes
•
"Before you begin" (page 96)
•
"Using the NEBS floor template" (page 97)
•
"Preparing the floor for anchor holes" (page 101)
Passport 15000, 20000 Site Requirements and Preparation Guide
For procedure page
numbers, see
Task flow navigation
below
End
5.2S2
95