Before You Begin; Safety Precautions; Tools And Equipment Required - Nortel Passport 15000 Preparation Manual

Hide thumbs Also See for Passport 15000:
Table of Contents

Advertisement

96 Chapter 3 Site preparation

Before you begin

Safety precautions

Tools and equipment required

241-1501-205 5.2S2
This section provides information you need to consider before performing
any of the procedures required for site preparation. The following topics are
included:
"Safety precautions" (page 96)
"Tools and equipment required" (page 96)
While you are preparing the floor, you must observe the general safety
precautions against personal injury and equipment damage outlined in your
local office standards. The procedures in this document contain specific
caution and warning information that you must observe while performing
each procedure.
For a description of the cautions and warnings which will appear in the
procedures described in this document, see "Personal safety" (page 22).
Before following any of the procedures in this section, you should also see
"Safe equipment handling" (page 23) for a description of the tools and
personnel required to move Passport 15000 or 20000 switches in a frame into
position.
You must have the following tools and equipment to prepare the floor:
a line marker (for example, chalk, wax pencil, or ink marker)
raised floor marker
2-lb. ball peen hammer
vacuum cleaner
safety goggles
ear plugs
steel square, 12-in. by 24-in. minimum
straight edge, 4-ft minimum
50-ft. (15 m) tape

Advertisement

Table of Contents
loading

This manual is also suitable for:

Passport 20000

Table of Contents