f.
Connect the positive battery lead to the
terminal "a", and the negative battery lead
to the terminal "b", and then check the PTT
relay for continuity.
G/W G
a
PTT relay continuity
"b"
"c"
g. Disconnect the special service tool.
h. Install the PTT relay.
i.
Connect the PTT relay coupler, battery
power source, ground lead, and PTT mo-
tor leads.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
Checking the PTT switch (on bottom
cowling)
1. Measure:
• PTT switch input voltage
Out of specification Check the wire har-
ness for continuity.
Input voltage
12 V
Red (R)–Ground
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Disconnect the PTT switch coupler "a".
b. Measure the input voltage between the
PTT switch coupler terminal and ground.
Lg
Sb
d
b
c
e
"d"
"e"
a
c. Connect the PTT switch coupler.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
2. Check:
• PTT switch continuity
Out of specification Replace.
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Disconnect the PTT switch coupler.
b. Check the PTT switch for continuity.
PTT switch continuity
Switch po-
sition
UP
DN
c. Connect the PTT switch coupler.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
5-45
PTT system
c
b
Terminal
"a"
"b"
R
a
Sb
R
Lg
"c"