Table 104 Control Panel > Maintenance > Power > Power Management (continued)
LABEL
Keep Former
Status
Always Power
On
Always Power
Off
Apply
Reset

11.3.2 Power On/Off Schedule

Click Maintenance > Power > Power On/Off Schedule to display the following screen.
Figure 145 Control Panel > Maintenance > Power > Power On/Off Schedule
The following table describes the labels in this screen.
Table 105 Control Panel > Maintenance > Power > Power On/Off Schedule
LABEL
Enable Power
Control Schedule
Add Power
Control Schedule
Delete
Chapter 11 Control Panel: Maintenance
DESCRIPTION
Select this option to have the NAS automatically restart only if it was operating when the power
failed. The NAS remains off if it was already off when the power failed.
Select this option to keep the NAS operating as much of the time as possible. The NAS restarts
automatically even if it was turned off when the power failed.
Select this option to keep the NAS from automatically restarting when the power is restored
after a power failure. This is a computer's "traditional" behavior. Select this if you have other
servers such as a domain controller or DNS server that you want to start or check after a power
failure before the NAS turns on.
Click this to save your changes.
Click this to restore previously saved settings.
DESCRIPTION
Click this to have the NAS turn itself off and on or reboot according to the schedules you
configured.
Click this to go to the screen where you can configure the power control schedules.
Refer to
Section 11.3.3 on page 180
Click this to remove the selected power control schedule(s) from the list.
NAS Series User's Guide
for this screen.
179

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nas326Nas520Nas540Nas542Nas series

Table of Contents