Fujitsu PRIMERGY GX2570 M6 Upgrade And Maintenance Manual page 44

Table of Contents

Advertisement

Basic hardware procedures
Additionally, a lifter is required in the following cases:
– The server weighs more than 50 kg.
– The server weighs more than 21 kg and is to be removed above the height
of 25 U.
When using a lifter, this removal procedure needs to be carried out by
maintenance personnel.
Figure 5: Lifting the server
▶ Lift the server out of the rack rails and place it on an even surface.
44
Upgrade and Maintenance Manual
GX2570 M6

Advertisement

Table of Contents
loading

Table of Contents