Agilent Technologies G1563A Installation Manual page 25

Installation thermal conductivity detector on a 6890 gas chromatograph
Table of Contents

Advertisement

3.
Locate the troughs in the flow manifold and the ridges in the
pneumatics carrier. Slide the flow manifold into the carrier, lining up
the ridges and troughs.
Ridges
Troughs
4.
Route the switching valve leads from the flow manifold to the opening in
the PC board. If you're installing a front detector, tuck the leads
underneath the connectors on the PC board as shown. Gently insert the
leads into the opening.
Opening in PC board
Leads from back detector
Leads from front detector
Appendix: Installing the pneumatics module (early version)
Flow manifold
Back detector
Front detector
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

G1592a

Table of Contents