C-Com iNetVu 755A Service Manual page 25

Table of Contents

Advertisement

iNetVu New Generation Service Manual
5. Insert the (4) bottom screws on the clamp plate closest to the EL motor but do not fully tighten.
All (4) screws on that clamp plate should be loose until tension is set on the belt.
6. Insert and tighten the remaining (4) screws from the EL Pulley Clamp farthest from the
elevation motor.
7. Set the belt tension by adjusting the tensioning screw. Set the tension on the Pulley belt to 485
±24 Hz for the 1201, and 330 ±10 Hz for the 755/981/985 Platforms.
Tension Screw
8. To complete the replacement tighten the (4) bottom screws closest to the elevation motor.
Install (4) Screws
but do not tighten
C-COM Satellite Systems Inc.
Install (4) Screws
and tighten
Page 25 of 53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Inetvu 981aInetvu 985aInetvu 1201a

Table of Contents