Pneumatic Connection - GEM 1441 cPos-X Operating Instructions Manual

Intelligent electro-pneumatic positioner
Hide thumbs Also See for 1441 cPos-X:
Table of Contents

Advertisement

9 Pneumatic connection

▶ Observe the maximum control pressure of the actuator!
Connection in accordance with DIN
ISO 1219-1
1
3
V1
V2
2)
2
4
2)
1) The connections that are to be used are equipped with push-in fittings at the factory (depending on the order code for pneumatic lines 6/4
mm or 1/4").
2) Only available for the double acting action (code 3 or 6).
1. Establish the connection between the pneumatic output 2 (single acting) or connectors 2 and 4 (double acting) and the actu-
ator's pneumatic control air connector.
2. Connect the auxiliary power (supply air) to the air supply connection 1 (max. 7 bar/101 psi).
* Figure shows throttling (V1 and V2) in
the unthrottled position
www.gemu-group.com
CAUTION
Designation
Supply connection
Venting (with silencer)
Supply and exhaust air throttle for A1
Supply and exhaust air throttle for A2
Working connection (1) for process valve
(control function NC and NO)
Working connection (2) for process valve
(control function DA)
(V2)
(V1)
17 / 33
9 Pneumatic connection
Size
G1/8 female thread
1)
G1/8 female thread
-
-
G1/8 female thread
1)
G1/8 female thread
1)
GEMÜ 1441 cPos-X

Advertisement

Table of Contents
loading

Table of Contents