Pvc Connection Status - Paradyne FrameSaver 9120 User Manual

Hide thumbs Also See for FrameSaver 9120:
Table of Contents

Advertisement

PVC Connection Status

9121-A2-GB20-20
PVC connection statuses are selected from the Status menu. Only PVC
connections with Source DLCIs configured to be Active are shown.
Follow this menu sequence:
Main Menu
Status
Field
Status
No PVC Connections.
Source Link,
Network
Primary Destination
Port-1
Link, and
Port-2
Alternate Destination
BRI
Link
Mgmt Link name
Source EDLCI,
0 to 62
Primary Destination
EDLCI, and
Alternate Destination
EDLCI
1
Status
Active
Inactive
1
If the alternate destination status is Active, BRI-B1 or BRI-B2 appears; if Inactive,
BRI appears.
PVC Connection Status
May 1998
Displaying System Information
What It Indicates
PVC connections have yet to be
defined.
Identifies the cross-connection of
DLCIs configured for the access
unit.
Network – T1 network
Port – Port-1 or Port-2
BRI – B-channel 1 or 2
Mgmt Link – PVC is a
management link that terminates
in the access unit; name is set up
from Management PVCs Options
( Path: main/config/management/
pvc/entry).
For multiplexed DLCIs only.
Identifies an individual link/
connection embedded within a
DLCI.
Identifies whether the virtual circuit
is active or inactive. It is a
combination of the physical layer
status (alarms or control leads), the
frame relay Link Status (enabled or
disabled), and the frame relay
network's specified status.
4-17

Advertisement

Table of Contents
loading

Table of Contents