Processor Unit - Furuno FAR-2117 Installation Manual

Marine radar/arpa
Hide thumbs Also See for FAR-2117:
Table of Contents

Advertisement

2.4

Processor Unit

Four cables are terminated at the processor unit: the antenna unit cable, display unit cable,
control unit cable and the power cable. Cables other than the power cable come with a
connector preattached to them for connection to the processor unit. Fabricate the power
cable as below. For the power cable, use DPYC-2.5 (Japan Industry Standard) cable for AC
unit or DPYC-6 for DC unit, or the equivalent.
Note: For AC unit
Pass the AC line through a double-contact breaker (shipyard supply).
Fabricating the power cable
1. Cut armor of the cable by 40 mm.
2. Cut vinyl sheath by 35 mm.
3. Remove insulation of wires by about 10 mm. Fix crimp-on lugs to the cores.
4. Peel paint of the armor by 40 mm.
5. Cover the end of armor with vinyl tape.
(a)
Armor
(b)
(c)
40 mm: Peel paint.
(d)
Conductor of DPYC-2.5
2
φ = 2.01 mm
Conductor of DPYC-6
2
φ = 3.12 mm
Fabricating power cable DPYC
DPYC-2.5
Approx. 40 mm
35 mm
Vinyl sheath
10 mm
Taping
(sectional view)
2. WIRING
Armor
2-7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Far-2117-bbFar-2127Far-2127-bbFar-2817Far-2827

Table of Contents