1. INSTALLATION
1.5.2
How to install the Power Supply Unit
Use four bolts (M6, local supply) to
fasten the Power Supply Unit.
For bulkhead mounting, fasten two
bolts for the lower notches, leaving 5
mm of thread exposed from the bolt
head. Set the notches of the Power
Supply Unit on the two bolts, then fas-
ten two bolts for the upper bolt holes.
Then secure the Power Supply Unit in
place with all four bolts fastened tight-
ly.
Note: For bulkhead installations, the
cable entry must face the deck.
1.6

Processor Unit

This unit can be installed on a bulkhead, wall or on the floor.
1.6.1
Installation considerations
Keep in mind the following points when selecting a location.
• Locate the Processor Unit away from heat sources because of heat that can build
up inside the cabinet.
• Select a location where the vibration is minimal.
• Locate the equipment away from places subject to water splash and rain.
• Leave sufficient space at the sides and rear of the unit to facilitate maintenance.
• A magnetic compass will be affected if the Processor Unit is placed too close to the
magnetic compass. Observe the compass safe distances in the SAFETY IN-
STRUCTIONS to prevent interference to a magnetic compass.
• Allow for a service clearance of 100 mm in front of the vent hole (front and rear
sides).
1-24
Front view
Cable entrance side
Bolt holes
Notches
Rear view
: Vent hole