1.2
Getting Started
The pre-installation process involves the following:
•
Selecting a site
•
Unpacking the components
•
Positioning the system
•
Moving the System
1.2.1
Selecting a Site
Consider the following when selecting a site for the system:
1. Find a place that is comfortable for you. Avoid dusty areas of extreme
temperature and humidity.
2. Cable paths should not run near equipment that might cause electromagnetic
or frequency interference such as radio transmitters, television sets, copying
machines, heaters, or air conditioners.
3. Find a location close to an electrical outlet. Avoid using extension cords.
4. Leave enough space around the system for normal air circulation.
Chapter 1 - System Housing 1-5