5.
Align the two switches on the new CK-1019 board with the two knob positions on the cabinet (R) and install it.
CK-1019 board
Cabinet (R)
Boss
6.
Install in the reverse procedure of steps 1 to 4 in procedure.
HXR-NX80/HXR-MC88
Switches
Boss
Knobs
3-22