Toro Z MASTER 4000 Series Service Manual page 39

Hide thumbs Also See for Z MASTER 4000 Series:
Table of Contents

Advertisement

Kawasaki Engine Installation (continued)
4000 Series Z MASTER® Service Manual
3442-427 Rev A
g346046
13. Install the hydrostatic drive belt to the engine pulley.
Replacement (page 7–5)
14. Install the deck belt.
15. Connect the choke cable.
16. Connect the throttle cable.
5–15)
17. Install the rear guard asm. Install and tighten the 6 (5/16 inch) torx screws
and lock nuts securing the rear guard to the chassis.
g346045
18. Install the top rear guard. Install and tighten the 2 (5/16 inch) torx screws
securing the top rear guard to the rear guard asm.
Figure 12
Deck Belt Replacement (page 6–4)
Choke Cable Assembly Replacement (page 5–16)
Throttle Cable Assembly Replacement (page
Figure 13
Page 4–9
Hydrostatic Drive Belt
Engine: Service and Repairs

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents