Safety notes
1.1
Warnings and cautions
Warnings and cautions
• During commissioning of the Inverter it is essential to ensure that the system is in a safe
• The IOP can be fitted to and removed from the inverter while power is applied.
• The IOP will set the USS PZD (P2012) length to 4 when connected to the inverter.
Intelligent Operator Panel (IOP)
Operating Instructions, 04/2015, FW V1.5.1, A5E00110011C AB
WARNING
and stable state, as some commissioning processes have the potential to start the
motor. Therefore it is important to secure any loads and ensure that should the motor
start, no potentially dangerous conditions exist.
1
7