Comtech EF Data XTD-750C-B1 Operation And Installation Manual page 103

Table of Contents

Advertisement

4.0
ENVIRONMENTAL
4.1
Non-operating
4.1.1
Temperature, non-operating
4.1.2
Shock, Vibration
4.2
Operating
4.2.1
Temperature
4.2.2
Humidity
4.2.3
Altitude, operating
5.0
TESTING REQUIREMENTS
5.1
Acceptance Test Procedure (ATP) requirements.
Frequency
Power
Transfer curve at mid-band
Reflected Power Protection
Gain, Small Signal
Gain flatness, small signal
Gain Control
Harmonic output
Spurious signals
Prime Power
Sample port calibration
5.2
First Article Test Procedure (FAT) requirements.
5.2.1
FAT testing is done per the specified agreements between Xicom and its customers.
5.2.2
The FAT test shall include at a minimum the ATP. Please specify the FAT requirements at
the time of order of the product.
T HI S DOCUME NT I S T HE P ROP E RT Y OF XI COM T E CHNOLOGY. RE P RODUCT I ON OR RE LE AS E WI T HOUT E XP RE S S P E RMI S S I ON I S S T RI CT LY P ROHI BI T E D.
XTD-750C, 5.85-6.425 GHz, R01
Document No. 305-0389-201
EAR EXPORT CONTROLLED: The information contained in this Manual refers or relates to a product that is subject
to the U.S. Export Administration Regulations (EAR). Transfer of data herein by any means to a Foreign Person,
whether in the U.S. or abroad, may require an export license from the U.S. Department of Commerce.
-50 to +70
C
Normal transportation
-40 to +50
C
Up to 100%, condensing
0 to 10,000 ft MSL max
Derated 2° C/1000 feet
3.1.1
3.1.2
3.1.2
3.1.2.2
3.1.4
3.1.5.1, 3.1.5.2, 3.1.5.3
3.1.6
3.1.8
3.1.13
3.1.15
3.2.2.4
REV 3
Page 7 of 10

Advertisement

Chapters

Table of Contents
loading

Table of Contents