Enterasys SecureStack C2 C2G124-48P Hardware Installation Manual page 67

Enterasys securestack c2 c2g124-48p: install guide
Table of Contents

Advertisement

Table 4-1 LANVIEW LED Diagnostic Indications (continued)
LED
Color
UP
Off
Green
Manager
Off
Green
RPS
Off
Amber
State
No valid connection to switch stack down
connector.
Solid. Valid connection to switch stack down
connector.
Blinking. Information is being transferred
through the high-speed stacking cable.
Switch is operating as a Member in the stack.
Solid. Switch is operating as the Manager of the
stack.
RPS not in use.
Solid. The switch internal power supply failed,
and the RPS is providing the proper power to
the switch.
Recommended Action
1.
Make sure the switch connected to
the stack down connector is
powered on.
2.
Replace cable with a known good
one.
3.
If the problem still exists, contact
Enterasys Networks for technical
support.
None.
None.
None.
None.
If an RPS is connected to the switch and
should be providing power, perform the
following:
1.
Ensure the RPS is powered on.
2.
Ensure that the AC power cord to
the RPS is plugged in correctly and
that there is power at the AC power
source.
3.
Replace the power cord with a
known good one.
4.
Ensure the DC power cord from the
RPS to the switch is plugged in
correctly.
5.
If the problem persists, contact
Enterasys Networks for technical
support.
SecureStack C2 Installation Guide 4-5
Using LANVIEW

Advertisement

Table of Contents
loading

Table of Contents