Recommended Procedures To Install New And Existing Stacks - Enterasys SecureStack C2 C2G124-48P Hardware Installation Manual

Enterasys securestack c2 c2g124-48p: install guide
Table of Contents

Advertisement

2.
Switch IDs are saved against each module. Then, every time a board is power‐cycled, 
it will initialize with the same switch ID. This is important for port‐specific 
information (for example: ge.4.12 is the 12th Gigabit Ethernet port on switch # 4).
3.
The management election process uses the following precedence to assign a 
management device:
a.
Previously assigned / elected management switch
b. Management assigned priority (values 1‐15)
c.
Hardware preference level
d. Highest MAC Address

Recommended Procedures to Install New and Existing Stacks

The following procedures assume that all switches have a clean configuration from manufacturing.
When adding a new switch to an already running stack, it is also assumed that the new switch is
using the same firmware image version as other switches in the stack.
Installing a New Stackable System of Up to Eight Switches
Use the following procedure to install a new stack of up to eight switches out of the box. 
Before applying power, make all physical connections with the stack cables as described 
in "Connecting High‐Speed Stacking Cables" on page 3‐10. 
1.
Once all of the stack cables have been connected, individually power on each switch 
from top to bottom (connecting power to a switch is described in "Connecting AC and 
PoE Power" on page 3‐15). 
If the switches are powered on almost simultaneously, the system will automatically 
select the first one that powers up as the Master switch and the others as Member 
switches. The switches are assigned unit IDs in the order that they become fully 
operational.
You can control the unit ID assignment according to the physical position in a stack. 
When you power up each switch and allow it to become fully operational before 
applying power to the next switch, the first one becomes the Manager and all the next 
switches will join that stack (regardless of Priority, Firmware Revision, or MAC 
Address). The switches are assigned unit IDs in the order that you power on each 
switch. 
Note: Once switch IDs are assigned, they are persistent and will be retained during a
power cycle to any or all of the switches.
Important
SecureStack C2 Installation Guide 3-13
Configuring Switches in a Stack

Advertisement

Table of Contents
loading

Table of Contents