Installation Procedure - Omron KP100G Technical Manual

Grid connect photovoltaic inverter
Hide thumbs Also See for KP100G:
Table of Contents

Advertisement

KP100G
5. Installation

Installation Procedure

Use the following procedure to install the Unit.
No.
Item
1
Checking package contents
2
Mounting the base plate
3
Mounting the Unit
4
Processing the plugs
5
Wiring the Unit
6
Preliminary Confirmations
7
Completion Inspection
Mounting
Package Contents
The following items are included in the KP100G package. Check that all of the items shown in the following are included in the package before you
start the installation.
KP100G, Mounting base plate, Technical Manual
Enclosed mounting screws
6 Mounting Screws
Table 5-1 Installation Procedure
Procedure
Check to make sure that all of the items listed on the reference
page are included in the package.
Use the enclosed mounting screws to mount the base plate to the
wall, according to the procedure described on the reference page.
Mount the KP100G to the base plate, according to the procedure
described on the reference page.
Follow the procedures on the reference pages to process the
communications plug and AC plug.
Wire the KP100G to the grid, and to the solar modules, as
described in Fig, 5-34 and Fig, 5-35 on the reference page.
Execute the preliminary confirmation according to the procedure
described on the reference page.
Conduct the completion inspection according to the procedure
described on the reference pages.
Fig, 5-1 KP100G, Mounting base plate, Technical manual
6 Snap Bushings
Fig, 5-2 Enclosed mounting screws
15
Reference Page
15
19
20
22
28
28
30
2 Safety-lock screws

Advertisement