Test Operation

6-1

Test Operation

6-1-1 Checklist

6-1-2 Test Operation Procedure

Apply power
Check reset input
operation
Use Monitor Unit
for offline test
Perform test run of system
End
76
Check the following items before performing the test operation.
No.
Check items
1
Power supply and I/O line
connections
2
DIP switch settings
3
R/W Head connection
4
DC positioning
5
Connections to PC
Line voltage and power supply terminal connection
Check I/O DC power supply voltage
Check that ID Controller and R/W Heads 1 and 2, POWER indicators are lit
Check stop when reset is input (STOP indicator lights)
Check communications between R/W Head and CD while disconnected
from host computer (this can also be done while connected) (see 6-1-3
Using Monitor Unit for Offline Test)
Check total system operation using actual commands
Checks
Has wiring been done correctly?
Are the terminal screws loose?
Have page settings been made correctly?
Are R/W Heads connected correctly?
Are DCs and R/W Heads correctly positioned?
Refer to the V600 FA ID System R/W Heads or
SRAM Data Carriers/V600 FA ID System R/W
Heads and EEPROM Data Carriers Operation
Manuals.
Has PC IN/OUT unit wiring and connector
connection been done correctly?