15.3.4 To install the outdoor unit on the installation structure
15.3.5 To provide drainage
LRYEN10A7Y1+LRNUN5A7Y1
CO₂ Conveni-Pack outdoor unit
4P605460-1 – 2020.08
Unit
LRYEN10*
LRNUN5*
▪
Fasten the unit in place using four foundation bolts M12. It is best to screw in the
foundation bolts until their length remains 20 mm above the foundation surface.
NOTICE
▪
Prepare a water drainage channel around the foundation to drain waste water
from around the unit. When the outdoor temperatures are negative, the drained
water from the outdoor unit will freeze up. If the water drainage is not taken care
of, the area around the unit might be very slippery.
▪
When installed in a corrosive environment, use a nut with plastic washer (a) to
protect the nut tightening part from rust.
a
1 Transport the unit by crane or forklift and put it onto the installation
structure. Also see
2 Fix the unit to the installation structure.
a
a
LRYEN10*
b
LRNUN5*
3 If transported by crane, remove the slings.
Make sure that condensation water can be evacuated properly.
A
1940
635
"13.2.2 To handle the outdoor
b
8×
15
Unit installation
|
B
C
1102
193
497
—
4
unit" [
39].
4×
Installer and user reference guide
63