To Install The Outdoor Unit - Daikin EPRA14DAW1 Installer's Reference Manual

Hide thumbs Also See for EPRA14DAW1:
Table of Contents

Advertisement

6.3.4 To install the outdoor unit

EPRA14~18DAV3+W1 + ETVH/X16S18+23DA6V+9W(G)
Daikin Altherma 3 H HT F
4P587502-1A – 2020.01
NOTICE
Level. Make sure the unit is level. Recommended:
Use 4 sets of M12 anchor bolts, nuts and washers. Provide at least 150 mm of free
space below the unit. Additionally, make sure the unit is positioned at least
100 mm above the maximum expected level of snow.
Anchor points
Pedestal
When installing on a pedestal, make sure that the discharge grille still can be put in
its safety position. See
4
safety
position" [
 69].
(mm)
a
Make sure not to cover the drain hole in the bottom plate of the unit.
1 Carry the unit by its slings, and put it onto the installation structure.
800
"6.3.7 To remove the discharge grille, and put the grille in
6
Unit installation
|
(mm)
4× M12
Installer reference guide
65

Advertisement

Table of Contents
loading

Table of Contents