Vertical Termination - 127 mmx 203 mm Flueing - Vertical Flex Kit (Part 946-772)

13. Slide the finished length up towards the flashing ensuring the length
13. Slide the finished length up towards the flashing ensuring the length of
of pipe is a minimum of 0.6 m measured from the top of the roof.
pipe is a minimum of 0.6m measured from the top of the roof. Level the
chimney and secure using the roof support provided with kit to bottom
Level the chimney and secure using the roof support provided
side of the roof as shown using a minimum of 2 screws per side- see
with kit to bottom side of the roof as shown using a minimum of
Diagram 3b. See Diagram 4 for roof pitch and height requirements. See
13. Slide the finished length up towards the flashing ensuring the length of
2 screws per side- see Diagram 3b. See Diagram 4 for roof pitch
pipe is a minimum of 0.6m measured from the top of the roof. Level the
Diagram 3a for securing method if 0.6m is insufficient and additional
chimney and secure using the roof support provided with kit to bottom
and height requirements. See Diagram 3a for securing method if
lengths are required, this may be purchased separately. See Simpson
side of the roof as shown using a minimum of 2 screws per side- see
Duravent components list in the instruction manual for part numbers.
0.6 m is insufficient and additional lengths are required, this may
Diagram 3b. See Diagram 4 for roof pitch and height requirements. See
be purchased separately. See Simpson Duravent components list
Diagram 3a for securing method if 0.6m is insufficient and additional
lengths are required, this may be purchased separately. See Simpson
in the instruction manual for part numbers.
Termination Cap
Duravent components list in the instruction manual for part numbers.
Storm Collar
Termination Cap
Flashing
Storm Collar
Flashing
Roof Support / Brace
Roof Support / Brace
Ceiling Firestop
Ceiling Firestop
Ceiling Firestop
Ceiling Firestop
Flex Pipe
Flex Pipe
Diagram 3
Diagram 3
Diagram 3
Elbow Support
Support to prevent sagging
Elbow Support
Support to prevent sagging
Diagram 3a
920-328
920-328
920-380
127 mm x 203 mm Flueing - Vertical Flex Vent Kit (946-772)
Termination Cap
Storm Collar
Termination Cap
Flashing
Storm Collar
Flashing
Roof Support
Roof Support
Ceiling Firestop
Enclosure
Ceiling Firestop
Ceiling Firestop
Enclosure
Flex Pipe
Ceiling Firestop
Flex Pipe
Diagram 3a
Diagram 3a
2
Termination Cap
Termination Cap
Storm Collar
Storm Collar
Flashing
Flashing
Termination Cap
Storm Collar
Roof support
Flashing
Roof support
Diagram 3b
Diagram 3b
Roof support
Roof Pitch
Diagram 3b
flat to 7/12
Roof Pitch
Minimum Vent Height
Enclosure
over 7/12 to 8/12
Meters
Ceiling firestop
flat to 7/12
over 8/12 to 9/12
Enclosure
over 7/12 to 8/12
Enclosure
over 9/12 to 10/12
over 8/12 to 9/12
over 10/12 to 11/12
over 9/12 to 10/12
over 11/12 to 12/12
Ceiling firestop
over 10/12 to 11/12
over 12/12 to 14/12
over 11/12 to 12/12
over 14/12 to 16/12
over 12/12 to 14/12
over 14/12 to 16/12
over 16/12 to 18/12
over 16/12 to 18/12
over 18/12 to 20/12
over 18/12 to 20/12
over 20/12 to 21/12
over 20/12 to 21/12
14. Put a bead of caulking on the exterior between the outer pipe and flashing
14. Put a bead of caulking on the exterior between the outer pipe and flashing
to prevent water from penetrating the chimney system.
to prevent water from penetrating the chimney system.
15. Slide storm collar over pipe length until it reaches the flashing.
15. Slide storm collar over pipe length until it reaches the flashing.
16. Install termination cap by twist locking it.
16. Install termination cap by twist locking it.
17. Secure the flashing to the roof using screws
17. Secure the flashing to the roof using screws
Note: Any closets or storage spaces which the vent passes through must
Note: Any closets or storage spaces which the vent passes through must
be enclosed.
be enclosed.
14. Put a bead of caulking on the exterior between the outer pipe and
flashing to prevent water from penetrating the chimney system.
15. Slide storm collar over pipe length until it reaches the flashing.
16. Install termination cap by twist locking it.
17. Secure the flashing to the roof using screws
Note: Any closets or storage spaces which the vent passes through
must be enclosed.
2
Page 2
Vertical Termination
installation
installation
Diagram 4
Minimum Vent Height
Diagram 4
Diagram 4
Meters
Ceiling firestop
0.61
0.61
Ceiling firestop
Minimum Vent Height
0.61
0.61
0.61
Roof Pitch
0.76
0.61
Ceiling firestop
0.99
0.76
flat to 7/12
1.22
0.99
1.52
over 7/12 to 8/12
1.22
Ceiling firestop
1.83
1.52
over 8/12 to 9/12
1.83
2.13
2.13
2.29
over 9/12 to 10/12
2.29
2.44
over 10/12 to 11/12
2.44
over 11/12 to 12/12
over 12/12 to 14/12
over 14/12 to 16/12
over 16/12 to 18/12
over 18/12 to 20/12
over 20/12 to 21/12
09.18.20
City Series ACB60E | 61
City Series ACB60E | 61
City Series ACB60E | 63
installation
Meters
0.61
0.61
0.61
0.76
0.99
1.22
1.52
1.83
2.13
2.29
2.44
09.18.20
03.10.21

Advertisement

Table of Contents
loading

Table of Contents