Run Tests Dialog Box - 3Com EtherLink 3C529 User Manual

Parallel tasking 16/32-bit micro channel adapters
Table of Contents

Advertisement

NOTE: You can also run the tests from the command
line. For more information, refer to Appendix A.
1. Under the Test pull-down menu, select Run Tests.
Press [Enter].
The Run Tests dialog box appears, similar to the one
shown in Figure 6-4.
Figure 6-4. Run Tests Dialog Box
2. Press [Enter] to start the Group 1 tests.
Each test is set up to run ten times unless you specify
otherwise. The test results are displayed on the
screen with Passed or Failed in the Results column.
Troubleshooting 6-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Etherlink iii

Table of Contents