Figure 5-20 Open Battery Breaker - Toshiba G2020 Series Installation And Operation Manual

480/480 v 500kva/750kva
Hide thumbs Also See for G2020 Series:
Table of Contents

Advertisement

e.) If stopping both the Inverter and Converter is required, open the Battery Disconnect circuit breaker CB2. (Figure
5-20)
!
When "REMOTE OPERATION MODE" is displayed on the LCD panel, the inverter start
operation can only be performed remotely. If local inverter stop operation is required (at the
UPS), select "LOCAL ONLY" or "REMOTE & LOCAL" in the OPERATION MENU.
NOTE
Verify the load is OFF if the next step is to be performed.
WARNING
!
Power to the critical load is supplied through the bypass line.
Power to the critical load will be lost after execution of the next step. The load will drop.
NOTE
f.)
If a dual source is feeding the UPS, open the External AC Input Circuit Breaker (user supplied) manually.
g.) If turning off all power to the critical load is required, open the External Bypass Input Circuit Breaker (user
supplied) manually.
58

Figure 5-20 Open Battery Breaker

G2020 Series UPS Installation and Operation Manual – 94861-004