App Functions; Setting A Project Weekly Program - Theben SELEKTA top2 Series Manual

Astronomical time switches with weekly program
Table of Contents

Advertisement

13.5 App functions

Projects:
Create a new project
Edit existing projects on the mobile device
Duplicate existing projects on the mobile device
Transfer existing projects from the mobile device to the time switch
Transfer existing projects from the time switch to the mobile device
Send projects from the mobile device via e-mail
Import/open projects from an e-mail attachment
Save or load projects to a cloud
Direct commands/Device status:
Send time and date to the device
Execute manual switch command
Enter/delete holiday program
Read out operating hours

13.5.1 Setting a project weekly program

A project always consists of a program (e.g. Monday to Friday, 8:00 AM ON and 8:00 PM OFF) and
device settings.
All data (program + device settings = project) can be transferred simultaneously. It is also possible to
transfer just the program or just the settings. Check this in the app before starting the data exchange.
A project is always intended for a specific device type (e.g. switching program for
SELEKTA 174 top3) and can only be transferred to that same device type too.
!
If a device is locked with a PIM code, this is requested before the data is transferred.
Any switch-on and switch-off times you like can be defined for each day of the week. The switching
times are set to the minute (hh:mm) either via a list view or, alternatively, a graphical input interface,
similar to that found in the OBELISK PC software.
Page | 84

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents