Toshiba PORTEGE R400 Maintenance Manual page 46

Hide thumbs Also See for PORTEGE R400:
Table of Contents

Advertisement

2 Troubleshooting Procedures
DC IN icon
Lights green
Flashes orange
Doesn't light
*1 When the Power Supply Controller (PSC) detects a malfunction, the DC IN icon blinks
orange. It shows an error code.
When the icon is blinking, perform the following procedure.
1.
Remove the battery pack and the AC adapter.
2.
Re-attach the battery pack and the AC adapter.
If the icon is still blinking after the operation above, check the followings:
Check 1
If the DC IN icon blinks orange, go to Procedure 2.
Check 2
If the DC IN icon does not light, go to Procedure 3.
Check 3
If the battery icon does not light orange or blue, go to Procedure 4.
NOTE: Use a supplied AC adapter G71C0004A510 (3-pin)/ G71C0002SC10 (2-pin).
2-8
[CONFIDENTIAL]
Table 2-2 DC IN icon
DC power is being supplied from the AC adapter.
There is a problem with the power supply. *1
Any condition other than those above.
Power supply status
PORTEGE R400 Maintenance Manual (960-623)

Advertisement

Table of Contents
loading

Table of Contents