Commissioning
11.1
Overview
Introduction
This section includes information on the following topics:
● Check before powering on for the first time
● Removing/inserting the SIMATIC memory card
● First power-on of the SIMATIC Drive Controller
● Downloading a project to the device
● Operating states of the SIMATIC Drive Controller
● Operating states of the SINAMICS Integrated
● Runtime licensing
● CPU memory reset: automatic and manual
● Backing up and restoring the CPU configuration
● Backup/restore of SINAMICS NVRAM data
● Time-of-day synchronization
● Identification and maintenance data
● Shared commissioning of projects
SIMATIC Drive Controller
System Manual, 11/2019, A5E46600094-AA
11
189