Start-Up; Unit Operation - Trane Climate Changer T Series Installation Operation & Maintenance

Table of Contents

Advertisement

Start-Up

Unit Operation

Rotating Components!
During installation, testing, servicing and troubleshooting of this product it may be
necessary to measure the speed of rotating components. Have a qualified or licensed
service individual who has been properly trained in handling exposed rotating
components, perform these tasks. Failure to follow all safety precautions when
exposed to rotating components could result in death or serious injury.
Live Electrical Components!
During installation, testing, servicing and troubleshooting of this product, it may be
necessary to work with live electrical components. Have a qualified licensed electrician
or other individual who has been properly trained in handling live electrical
components perform these tasks. Failure to follow all electrical safety precautions
when exposed to live electrical components could result in death or serious injury.
Before complete start-up, bump-start the unit and confirm the fan wheel rotates properly,
as indicated by the rotation arrow located on the fan housing.
After initial startup:
76
WARNING
WARNING
Calculate the motor voltage imbalance, notifying the power company to correct
unacceptable imbalances.
Periodically check the fan belt tension.
T-Series Climate Changer Air Handler IOM • CLCH-SVX06A-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents