General Information
When installing on a roof, make sure the roof floor is strong enough and be sure to water-proof
all work.
Make sure the area around the machine drains properly by setting up drainage grooves around
the foundation.
(Condensate water is sometimes discharged from the outdoor unit when it is running.)
Block all gaps in the holes for passing out piping and wiring using sealing material (locally
procured).
(Small animals may enter the machine.)
1
2
1. Plug the areas marked with "
(When the piping is routed from the front panel.)
2. Gas side piping
3. Liquid side piping
3
Installation
".
61