Daikin VRV REYQ96MTJU Design, Installation & Testing Instruction page 235

Hide thumbs Also See for VRV REYQ96MTJU:
Table of Contents

Advertisement

Si39-406
Refrigerant Piping ................................................... 146
S
Selecting Installation Site ........................................ 178
Selection of Location............................................... 141
AM broadcasting......................................... 57
servicing and the minimum space .............. 56
Service Space ........................................................... 58
Service Space for Indoor Units ................................. 17
Set the flaring tool ..................................................... 26
Setting of Air Flow Direction Adjustment Range ....... 73
Setting of Demand Operation.................................... 89
Image of operation in the case of A.................... 90
Image of operation in the case of A and B ......... 90
Image of operation in the case of B.................... 90
Setting of Low Noise Operation ................................ 87
Image of operation in the case of A.................... 88
Image of operation in the case of A, B ............... 88
Image of operation in the case of B.................... 88
Setting the Master Remote Controller..................... 207
Side (bottom) connection ........................................ 147
Signal interference due to use of
multiple core cable ........................................... 123
Sleeve and Insert Work
Operational steps ............................................... 14
Steel insert.......................................................... 15
Through holes in a reinforced concrete beam .... 14
Sound pressure rise due to room reverberation........ 99
Special vacuum drying time chart ............................. 40
Standard Operation Limit ........................................ 136
standard work practice for all brazing work............... 21
System example...................................................... 161
T
The analysis of major installation problems
experienced during the year of 1988 ................... 7
The centralized control group number
cannot be set ................................................... 129
The unit must be installed on a solid longitudinal
foundation ........................................................ 144
The use of "hard solder" is essential ......................... 25
Thermal Insulation Work (Refrigerant Piping)
Essential Points of Thermal Insulation................ 31
Heat Recovery Series......................................... 32
Operational steps ............................................... 31
Tighten the bolts in opposite corners first to ensure that
the connection is true......................................... 30
Torque wrench ........................................................ 220
Transmission wiring between the cool/heat
selector and the outdoor unit is too close
to a high voltage wire ....................................... 129
U
Unpacking and Placing the Unit ................................ 60
DO NOT USE STANDS TO SUPPORT THE
CORNERS............................................. 60
foundation bolts .................................................. 60
Drawings & Flow Charts
passing piping out through the front....................61
The unit must be installed on a solid longitudinal
foundation ..............................................60
V
,
141
Vacuum Drying ..........................................................34
,
141
Vacuum Drying Procedure.........................................38
Vacuum pump with check valve ..............................220
VRV Inspection Sheet..............................................114
W
Weigher for refrigerant charge.................................223
Where there are no smaller room divisions ...............97
Wired Remote Controller ...........................................68
Wiring Diagram
Field Wiring .......................................................122
Wiring Diagrams ......................................................121
Field Wiring .......................................................122
Outdoor Unit......................................................121
with cool/heat changeover .......................................202
without cool/heat changeover ..................................201
v

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents