Installation
Service Space
It is extremely important that enough space is left when installing the equipment to allow routine
servicing and maintenance to be carried out without undue hindrance. It is particularly important to
bear in mind the work which will be required if the compressor needs to be replaced. (The layout of
the pipework can sometimes cause considerable difficulties if the compressor needs to be
changed.)
3.2.13 Inspecting and Handling the Unit
At delivery, the package should be checked and any damage should be reported immediately to
the carrier claims agent.
When handling the unit, take into account the following:
1.
2. Choose the path along which the unit is to be brought in ahead of time.
3. If a forklift it to be used, pass the forklift arms through the large openings on the bottom of the
4. Lift the unit preferably with a crane and 2 belts of at least 27ft. long.
5. When lifting the unit with a crane, always use protectors to prevent belt damage and pay
6. After installation, remove the transport clasps attached to the large openings.
7. Bring the unit as close to its final installation position in its original package to prevent damage
1. Packaging material
2. Forklift
3. Belt sling
4. Wear plate
5. Removal of shipping brackets
6. Shipping bracket (Remove the screws.)
7. Removal of corrugated paper
8. Corrugated paper
58
Fragile, handle the unit with care.
Keep the unit upright in order to avoid compressor damage.
unit.
attention to the position of the unit's centre of gravity.
during transport.