2.4.2 Main Considerations in Preparation of Control Circuit Diagrams
In addition to the design of the appropriate this system configuration it is also essential that the
control system be made amply clear. If the system is designed and installed without a clear,
comprehensive plan then problems are inevitably going to occur during the test run.
Servicing too will become much more time consuming than necessary. However, if control circuit
diagrams are prepared along with the contract drawings in order to make the total system clearly
visible then the essential points relating to the electrical connections will be easily understood, the
test run will go off without a hitch and the whole system will be rendered fully effective.
Step 1: Compiling
1. Mark each outdoor unit with a code.
2. Add field settings and data for outdoor units, and outdoor unit No. if using sequential start.
a System List
3. Add the model number of each indoor unit connected to each refrigerant circuit.
4. Assign each indoor unit a code.
5. Fill in the location of each indoor unit.
6. Group indoor units controlled by one or two remote controllers. (group or individual control).
7. Assign central group Nos. if using centralized control.
8. Add field settings and optional equipment for indoor units.
9. Add unit No. if making separate field settings for each indoor unit under group control.
Note:
With the VRV R410A Heat Recovery Series, unit No. is determined through automatic
addressing, therefore readout unit Nos. after activating the power.
Example: System list
Outdoor Unit
Model Name
Field Settings
(code)
Cool/Heat
selector:
Indoor unit
Low noise
operation
(L.N.O.P):
REYQ96M
Individual control
(PAC1)
Sequential start:
ON Defrost:
Earlier Sequential
start No.
Cool/Heat
selector:
Indoor unit
Low noise
operation
(L.N.O.P):
REYQ96M
Individual control
(PAC2)
Sequential start:
ON Defrost:
Earlier
For details on field settings and centralized control group No., refer to the installation manual and
system reference materials.
General Information
Model Name System Name
FQ12M
2F01
SQ18M
2F02
FQ18M
2F03
MQ30M
2F04
FQ12M
2F05
SQ12M
3F01
FQ24M
3F02
SQ24M
3F03
FQ24M
3F04
Points to Bear in Mind at the System Design
Indoor Unit
Remote
Location
Controller
Control Group
Group
2nd floor
A
office
2nd floor
A
office
2nd floor
A
office
2nd floor
B
office
2nd floor
B
office
3rd floor
C
office
3rd floor
C
office
3nd floor
C
office
3rd floor
D
office
Centralized
Unit No.
equipment, field
No.
settings, etc.
1–00
(1–00)
(1–00)
1–01
(1–01)
1–02
(1–02)
(1–02)
1–03
Optional
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents