Daikin VRV REYQ96MTJU Design, Installation & Testing Instruction page 18

Hide thumbs Also See for VRV REYQ96MTJU:
Table of Contents

Advertisement

Points to Bear in Mind at the System Design
Step 2:
The following sequence should be followed in order to prepare control circuit diagrams in
accordance with the system list which has already been completed:
Preparation of the
Control Circuit
Diagrams
The control circuit diagrams are now complete.
Example: Control circuit diagram
12
Diagrams should be prepared for each individual outdoor unit. The outdoor unit model number
should be inserted into the diagram. (REYQ96M)
Insert name of refrigerant system. (PAC1, PAC2)
Insert name of indoor unit. (FXFQ12M→FQ12M)
Insert system name of indoor unit.
Insert installation position. (Do this when demarcation is possible)
Insert remote controller control wiring. (Group) Indicated by solid line. ........Solid line.
Insert centralized control wiring. ........Dotted line
Insert Group No. (G No. for each indoor unit with U No. 0)
Si39-406
General Information

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents