3.2.13 Inspecting and Handling the Unit
At delivery, the package should be checked and any damage should be reported immediately to the carrier
claims agent.
When handling the unit, take into account the following:
1.
2. Choose the path along which the unit is to be brought in ahead of time.
3. If a forklift it to be used, pass the forklift arms through the large openings on the bottom of the unit.
4. Lift the unit preferably with a crane and 2 belts of at least 8m long.
5. When lifting the unit with a crane, always use protectors to prevent belt damage and pay attention to the
6. After installation, remove the transport clasps attached to the large openings.
7. Bring the unit as close to its final installation position in its original package to prevent damage during
58
Fragile, handle the unit with care.
Keep the unit upright in order to avoid compressor damage.
position of the unit's centre of gravity.
transport.
RXYQ5 . 8 . 10 type
RXYQ5 type
1
3
2
RXYQ12 . 14 . 16 type
RXYQ8 . 10 type
1
1
2
1.Packaging material
2.Forklift
3.Opening (Large)
4.Belt sling
5.Opening (Small) (40×30)
6.Wear plate
7.Removal of shipping brackets
8.Shipping bracket (Remove the screws.)
RXYQ12 . 14 . 16 type
4
4
6
3
<
>
7
4
8
6
5
3
4
4
6