Remote Controller And Changeover Switch: Name And Function Of Each Switch And Display - Daikin VRV II Series Design, Installation & Testing Instructions

Hide thumbs Also See for VRV II Series:
Table of Contents

Advertisement

Si39-303
3. Remote Controller and Changeover Switch: Name
and Function of Each Switch and Display
RXYQ series
REYQ series
1. On/off button
2. Operation lamp (red)
3. Display "
4. Display "
Operation Manual

Remote Controller and Changeover Switch: Name and Function of Each Switch and Display

Press the button and the system will start. Press the button again and the system will stop.
The lamp lights up during operation.
" (changeover under control)
It is impossible to changeover heat/cool with the remote controller when this icon is
displayed.
" (air flow flap)
Refer to the chapter "Operation procedure - Adjusting the air flow direction".
203

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents