Daikin VRV II Series Design, Installation & Testing Instructions page 193

Hide thumbs Also See for VRV II Series:
Table of Contents

Advertisement

Si39-303
Caution
Be sure to follow the limits below. If the unit-to-unit cables are beyond these limits, it may result
in malfunction of transmission.
Maximum wiring length: 1000m
Total wiring length: 2000m
Max branches No. of branches: 16
Max. number of outdoor units connectable: 10 or less
Up to 16 branches are possible for unit-to unit cabling. No branching is allowed after branching.
Max. number of outdoor units connectable: 10 or less
Never connect the power supply to unit-to-unit cabling terminal block. Otherwise the entire
system may break down.
Sequential start
Make the outdoor unit cable connections shown below.
The outdoor unit PC board (A1P) is factory set at "Sequential start available".
Setting the cool/heat operation (heat pump unit only)
1. Performing cool/heat setting with the remote controller connected to the indoor unit.
2. Performing cool/heat setting with the cool/heat selector.
Installation Manual
1
Keep the cool/heat selector switch (DS1) on the outdoor unit PC board (A1P) at the factory
setting position IN/D UNIT.
TO IN/D
UNIT
F1
F1 F2
Connect the cool/heat selector remote controller (optional) to the A/B/C terminals and set the
cool/heat selector switch (DS1) on the outdoor unit PC board (A1P) to OUT/D UNIT.
2
O
U
T
ON
DS1
OFF
F2
1
2
3
4
I
N
F1 F2
F1 F2
O
U
T
ON
OFF
A B C
1
2
3
I
N
Cool/heat selector
A B C
1. Branch
2. Subbranch
Remote controller
DS1
4
Field Wiring
187

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents