Connecting The Grounding Cable To The Chassis - H3C S6820 Series Installation Manual

Hide thumbs Also See for S6820 Series:
Table of Contents

Advertisement

Figure 22 Attaching the mounting brackets and chassis rails to the S6820-4C switch
(network port-side mounting position for the mounting brackets)
NOTE:
Secure the mounting brackets and chassis rails to both sides of the chassis in the same way.

Connecting the grounding cable to the chassis

CAUTION:
The primary grounding point and auxiliary grounding point 1 are located on the left panel of the
chassis. If you use one of these grounding points, you must connect the grounding cable to the
grounding point before you mount the switch in the rack.
As a best practice, use the primary grounding point or auxiliary grounding point 1 because the
grounding cable and grounding screw that come with the switch are suitable only for these two
grounding points.
To use auxiliary grounding point 2 on the S6820-4C switch, prepare a grounding cable yourself.
This section uses the primary grounding point on the S6820-32H switch as an example.
To connect the grounding cable to a grounding point:
Choose a grounding point as required.
1.
This example uses the primary grounding point.
Unpack the grounding cable and grounding screws.
2.
Use two grounding screws to attach the two-hole grounding lug of the grounding cable to the
3.
grounding holes at the grounding point. Use a screwdriver to tighten the screws. See
14
Figure
23.

Advertisement

Table of Contents
loading

This manual is also suitable for:

S6820-32hS6820-56hfS6820-4c

Table of Contents