Verifying The Installation - H3C S6820 Series Installation Manual

Hide thumbs Also See for S6820 Series:
Table of Contents

Advertisement

Figure 43 Removing an LSWM18CQ interface card
1

Verifying the installation

After you complete the installation, verify that:
There is enough space for heat dissipation around the switch, and the rack is stable.
The grounding cable is securely connected.
The correct power source is used.
The power cords are correctly connected.
All the interface cables are cabled indoors. If any cable is routed outdoors, verify that the socket
strip with lightning protection and lightning arresters for network ports have been correctly
connected.
2
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

S6820-32hS6820-56hfS6820-4c

Table of Contents