INSTALLATION AND PREDELIVERY
OUTBOARD RIGGING
board side of the powerhead. Secure all cables to
anchor points with tie-straps.
1. Anchor points

Control Cable Installation

Remove remote control cable trunnion covers and
cable attachment hardware.
1
1. Trunnion covers
Cable Retainer Clip Installation
When installing retainer clips on control arm link-
age pins, clips should be locked and must not be
bent or deformed.
For proper installation, review the following steps:
Place washer on pin.
Position retainer clip with straight section on the
bottom and angled section on the top.
60
Use long nose pliers to insert straight section of
clip into linkage pin hole.
1
1. Straight section
2. Angled section
Push the clip towards the hole while lifting on
004949
the curved end with the pliers.
Be sure retainer clip fully engages the pin.
Lock the retainer by moving the angled section
behind the straight section.
Locked Retainer Clip
1. Angled section behind straight section
Shift Cable Installation and Adjustment
Position the shift cable on the shift lever pin and
install the washer and retainer clip.
004955
IMPORTANT:
Confirm that the remote control, gearcase, shift
linkage, and shift cable are in NEUTRAL.
Hold the shift linkage in NEUTRAL and grab the
shift cable firmly.
Push and pull on the shift cable and observe the
cable slack. Position the casing guide in the cen-
ter of the slack.
Adjust shift cable trunnion to align with center of
the trunnion block. Place cable trunnion in trun-
nion block.
Do not bend or deform clip.
1
2
DP0818
DP0817
1
DP0817A