Hardware Requirements - Avaya Ethernet Routing Switch 8300 Series Installation Manual

Chassis
Hide thumbs Also See for Ethernet Routing Switch 8300 Series:
Table of Contents

Advertisement

Chassis installation fundamentals
Space requirements
The installation site must provide sufficient free space around the chassis to ensure proper
ventilation and access for servicing.
Use the following guidelines to plan front and rear access:
• The maintenance aisle in front of the frame requires a clearance of 76.2 centimeters (cm)
(30 inches).
• The wiring aisle at the back of the frame requires a clearance of 61 cm (24 inches).
AC input electrical requirements
Refer to the power specifications for the power supply in
page 57.
For AC input power specifications for each of the modules, see Avaya Ethernet Routing Switch
8300 Installation — Modules (NN46205-305).
Environmental requirements
The installation site must meet the following environmental requirements for 8300 chassis
operation. For more information, see the following table.
Table 2: Environmental requirements
Altitude
0-10000 feet (ft) (0-3048
meters [m])

Hardware requirements

This section includes information about the hardware shipped with the 8306 and 8310
chassis.
26
Installation — Chassis
Humidity
5%-85%, noncondensing
Technical specifications
Temperature
32°F-104°F (0°C-40°C),
stable
on
May 2011

Advertisement

Table of Contents
loading

Table of Contents