Site Preparation Checklist For The Srx550 Hm Services Gateway - Juniper SRX550 Hardware Manual

High memory services gateway
Hide thumbs Also See for SRX550:
Table of Contents

Advertisement

Site Preparation Checklist for the SRX550 HM Services
Gateway
The checklist in
Table 15 on page 53
installing the SRX550 High Memory Services Gateway.
Table 15: Site Preparation Checklist for SRX550 High Memory Services Gateway Installation
Item or Task
Power
Measure distance
between external power
sources and device
installation site.
Locate sites for
connection of system
grounding.
Calculate the power
consumption and
requirements.
Environment
Verify that
environmental factors
such as temperature and
humidity do not exceed
device tolerances.
Rack Installation
Verify that your rack
meets the minimum
requirements.
summarizes the tasks you need to perform when preparing a site for
Additional Information
"SRX550 High Memory Services Gateway
Electrical Wiring Guidelines" on page 57
"Connecting the SRX550 HM Grounding
Cable" on page 83
"SRX550 High Memory Services Gateway
AC Power Supply Electrical Specifications"
on page 44
and
"SRX550 High Memory
Services Gateway DC Power Supply
Electrical Specifications" on page 45
"SRX550 High Memory Services Gateway
Environmental Specifications" on page 56
"SRX550 High Memory Services Gateway
Rack Size and Strength Requirements" on
page 66
Performed
By
Date
53
Notes

Advertisement

Table of Contents
loading

Table of Contents