7.4 NC100AY Body Section
7.4.1 Carrier Cover Removal/Reinstallation
Removal
1. Open the carrier cover.
2. Remove the three screws and then the carrier
cover.
Reinstallation
Reinstallation is essentially in the reverse order of
removal.
NOTE: Install the arm and spring as shown.
7.4.2 Load Harness Replacement
Removal
1. Remove the feed section unit
.
(See Subsection 7.2.1)
2. Remove the two screws securing the grounding
wires.
3. Remove the two screws and then the harness
cover by shifting it to the arrow direction.
Distributed by minilablaser.com
Screws (3)
Screws/Grounding Wires (2)
7-70
Carrier Cover
Arm
Spring
Screws (2)
Harness Cover
Z2218
Z2219
Z2242