Concluding Steps; Replacing The Power Distribution Board; Preliminary Steps; Removing The Defective Power Distribution Board - Fujitsu PRIMERGY TX1320 M4 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX1320 M4:
Table of Contents

Advertisement

Power supply unit (PSU)
6.3.3.4

Concluding steps

Ê Connect the power cord to the new hot-plug PSU and secure it with a cable
tie, see section
Ê Only when replacing a hot-plug PSU in a non-redundant configuration:
"Switching on the server" on page 63
"Performing a fan test" on page 94
Ê
6.3.4

Replacing the power distribution board

Field Replaceable Unit
(FRU)
Tools: hexagon head, 5 mm / cross PZ2 (not for Japan)
Phillips PH2 (for Japan)
6.3.4.1

Preliminary steps

"Locating the defective server" on page 47
Ê
"Suspending BitLocker functionality" on page 67
Ê
"Shutting down the server" on page 49
Ê
"Disconnecting the power cord" on page 50
Ê
"Getting access to the component" on page 51
Ê
Ê If applicable, remove the ODD, see section
page
246.
Ê If applicable, remove the RDX drive, see section
on page
256.
6.3.4.2

Removing the defective power distribution board

Ê Remove all PSUs, see section
112
"Connecting the power cord" on page
"Removing a hot-plug PSU" on page
Upgrade and Maintenance Manual
60.
Hardware: 25 minutes
"Removing the ODD" on
"Removing the RDX drive"
109.
TX1320 M4

Advertisement

Table of Contents
loading

Table of Contents