To mount the product into a four-post rack using the included rack-mount kit, refer to "Four-post rack mount installation (XBR-
R000297)" on page 27 for the installation procedure.
Four-post rack mount kit installation (XBR-R000297)
Use the following instructions to install the SLX 9030 or the SLX 9030-T Switch in EIA racks that are between 46 cm and 79 cm (18 to
31 in.) using the four-post flush-mount rack kit included with the switch.
Time and items required
Allow 15 to 30 minutes to complete the installation.
The following items are required to install the device using the Universal Four-Post Rack Kit:
•
#2 Phillips torque screwdriver
•
1/4-inch slotted-blade torque screwdriver
Parts list
The following parts are provided with the four-post flush-mount rack kit (XBR-R000297).
Verify that the items below are included in the parts list.
ExtremeSwitching SLX 9030 Hardware Installation Guide
9035691-02 Rev AD
Four-post rack mount kit installation (XBR-R000297)
27