To Verify The Operation Of The Slide Rails And The Cma; Figure 2-12 Unlocking The Slide Rail Assembly (Either Server) - Fujitsu Siemens Computers SPARC Enterprise T5140 Installation Manual

Table of Contents

Advertisement

To Verify the Operation of the Slide Rails and
the CMA
Tip – Two people are needed for this procedure, one to move the server in and out
of the rack, and one to observe the cables and CMA.
1. For a free-standing rack, deploy the antitilt bar.
2. Unlock the slide lock buttons (
chassis.
3. Slowly pull the server out of the rack until the slide rails reach their stops.
FIGURE 2-12
4. Inspect any attached cables for binding or kinks.
5. Verify that the CMA extends fully and does not bind in the slide rails.
6. Verify that the server extends fully and locks in the maintenance position.
The server should stop after approximately 15 inches (40 cm) of travel.
28
SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008
Unlocking the Slide Rail Assembly (Either Server)
) at the right and left sides of the
FIGURE 2-12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise t5240

Table of Contents