Fujitsu PRIMERGY RX800 S2 Operating Manual page 46

Hide thumbs Also See for PRIMERGY RX800 S2:
Table of Contents

Advertisement

Connecting and Disconnecting Cables
Four-node configuration
A four-node configuration requires three 2.3-m (7.6-foot) scalability cable kits
and three 2.9-m (9.5-foot) scalability cable kits. To cable a four-node configu-
ration for up to 16-way operation, complete the following steps:
Ê Remove the protective covers from the connectors on the ends of the cables
(see figure 9).
Ê Label each end of the SMP Expansion cables according to where it will be
connected to each server. See figure 12.
2.9-m SMP
Expansion cable
2.9-m SMP
Expansion cable
2.9-m SMP
Expansion cable
Figure 12: Cabling four nodes (scheme)
40
Installing the Server
Node 1
Node 2
Node 3
Node 4
U41621-J-Z156-1-76

Advertisement

Table of Contents
loading

Table of Contents