Connecting and Disconnecting Cables
Two-node Configuration
A two-node configuration requires two 2.3-m (7.6-foot) scalability cable kits. To
cable a two-node configuration for up to 8-way operation, complete the following
steps:
Ê Remove the protective covers from the connectors on the ends of the cables
(figure 9).
Figure 9: Protective cover for scalability cable
Ê Label each end of the SMP Expansion cables according to where it will be
connected to each server. See figure 10 and figure 11.
Figure 10: Cabling two nodes (scheme)
38
Protective cover
Node 1
Node 2
Installing the Server
U41621-J-Z156-1-76